HMWSSB Plans Direct Treated Water Pipelines for Construction Sites

The initiative targets large developments with long-term water requirements, while strengthening quality checks and monitoring at green water filling stations.

HMWSSB Plans Direct Treated Water Pipelines for Construction Sites
HMWSSB Managing Director Ashok Reddy reviews green water tanker facilities and the potential demand near Nagole and Patel Cheruvu STPs. (Supplied)

PROPERTY PULSE

Hyderabad: Large construction projects in Hyderabad could soon receive treated wastewater directly from sewage treatment plants (STPs) through dedicated pipelines, reducing their dependence on drinking water and groundwater. The Hyderabad Metropolitan Water Supply and Sewerage Board (HMWSSB) is exploring 300–400 metre pipeline connections to major construction sites as part of its efforts to expand the use of recycled water.

HMWSSB Managing Director Ashok Reddy directed officials to prepare a comprehensive plan to utilise the full treatment capacity of existing STPs and increase the supply of treated water. During inspections of the Nagole and Patel Cheruvu STPs, he reviewed treatment operations, green water tanker facilities and the potential demand from the construction sector.

At Nagole, the MD inspected the green water tanker filling station and reviewed the functioning of the board's airtech equipment. He asked officials to assess the engineering requirements, electricity consumption and maintenance costs involved in operating STPs at full capacity. Proposals for additional pipeline connections, including estimated costs and implementation timelines, were also sought.

At Patel Cheruvu STP, Ashok Reddy and local MLA Bandari Lakshma Reddy flagged off green water tankers to supply treated water to construction sites. The MD urged builders in the surrounding areas to use the facility for non-drinking requirements instead of relying on potable water and borewells.

He subsequently visited The Vermont Nirvana Homespaces construction site and discussed the feasibility of supplying treated water directly to the project. He suggested that developments involving two or more buildings and requiring water over an extended construction period should explore dedicated pipeline connections rather than depending entirely on tankers.

Officials have been asked to identify major projects with water requirements extending for at least two years and examine the feasibility of laying pipelines over distances of around 300–400 metres. The assessment should cover installation costs, supply capacity, maintenance requirements and the possibility of extending the network to serve other projects.

Water quality and supply monitoring will also be part of the proposed system. The MD directed officials to establish suitable quality standards for construction activities, concrete curing, gardening and landscaping, with testing reports and certificates made available to users. Independent testing of water samples should also be permitted wherever required.

He further called for computers, scanners and other facilities at green water filling stations to record tanker details and monitor supplies. Stressing that scientifically treated wastewater is suitable for approved non-potable uses, he urged builders, commercial establishments and landscape operators to adopt green water.

HMWSSB Cyberabad Executive Director Pankaja, Director (Operations) Narayana and other senior officials participated in the inspections.

Also Read: MMC Pushes Ghatekesar ROB, Drainage Works

What's Your Reaction?

Like Like 0
Dislike Dislike 0
Love Love 0
Funny Funny 0
Angry Angry 0
Sad Sad 0
Wow Wow 0