Hyd lans ₹308-cr steel bridge at Lingampally

Four-lane, 2-km elevated link proposed to improve connectivity across western Hyderabad

Hyd lans ₹308-cr steel bridge at Lingampally

Property Pulse

The Telangana government is planning a major road infrastructure project near Lingampally Railway Station to ease traffic congestion in western Hyderabad. A nearly 2-km-long, four-lane steel road overbridge, estimated to cost ₹308 crore, has been proposed to improve connectivity between Gulmohar Junction and BHEL.

The project is expected to benefit commuters travelling between Gachibowli, the IT corridor and residential neighbourhoods such as Tellapur, Nallagandla, Lingampally and Serilingampally. It is also intended to reduce traffic pressure on existing railway crossings and congested road junctions in the area.

Four-lane proposed

The proposed bridge will connect Gulmohar Junction with BHEL, providing an additional road link for traffic moving towards the industrial and residential areas around Lingampally. Once completed, the elevated corridor is expected to offer an alternative route for commuters travelling from Gachibowli towards BHEL.

It could also ease congestion on the existing Nallagandla Railway Overbridge and near the Lingampally underpass, which experience considerable traffic movement. The project assumes significance as residential development across Tellapur, Nallagandla and surrounding localities has increased commuter movement towards major employment centres in western Hyderabad.

Steel structure to expedite construction

Authorities are considering a steel structure with the objective of accelerating construction compared with conventional concrete construction methods. Steel components can be fabricated separately and assembled at the project site, potentially reducing construction time and prolonged disruption to existing traffic. The actual execution schedule will depend on project approvals, tendering, fabrication and construction arrangements.

The proposed infrastructure plan includes a two-lane up-ramp from Gulmohar junction, extension of two-lane up-ramps for traffic coming from Gachibowli and widening existing 80-foot roads to 100 feet. These interventions are intended to improve traffic movement across the wider Lingampally road network rather than address congestion at a single junction.

Relief for western Hyderabad commuters

Tellapur, Nallagandla, Lingampally and Serilingampally have emerged as important residential destinations, particularly among IT professionals working in Gachibowli, the Financial District and Madhapur. Increasing residential density has placed additional pressure on existing road infrastructure, especially during peak commuting hours. The proposed bridge and associated road improvements could strengthen connectivity between these residential neighbourhoods and employment centres. Improved road access may also support the attractiveness of residential developments in the surrounding areas.

 URBAN MOBILITY

1.     Project estimate stands at ₹308 crore.

2.     Nearly two-kilometre four-lane steel bridge proposed.

3.     Gulmohar Junction to BHEL connectivity planned.

4.     Alternative route planned for Gachibowli commuters.

5.     Existing 80-foot roads proposed for widening.

6.     Tellapur and Nallagandla among beneficiary neighbourhoods.

What's Your Reaction?

Like Like 0
Dislike Dislike 0
Love Love 0
Funny Funny 0
Angry Angry 0
Sad Sad 0
Wow Wow 0